The development will consist of the remodelling and extension of the existing hotel at 4th – 7th floor levels fronting onto St. Stephen’s Green (c. 827 m2).
Works to the front of the Hotel:-
The reorganisation and extension of the existing bedrooms and circulation spaces at 5th floor level, resulting in 2 no. additional bedrooms, with new bedroom terraces at this level fronting onto St. Stephen’s Green;
8 no. additional bedrooms with terraces fronting onto St. Stephen’s Green, a new terrace to the existing presidential suite and revised circulation and servicing arrangements at 6th floor level; and,
6 no. additional bedrooms with revised circulation and servicing arrangements at 7th floor level.
Works to the rear of the Hotel:
The Project involves the alteration of the hotel roof and façade to facilitate the provision of 34 no. new hotel bedrooms to the rear of the existing 6 storey hotel block fronting onto St. Stephen’s Green.
Also completed M&E Services to the Dining Room at Fitzwilliam Hotel, 2017.