Project Description

DUB40

Client:

Echelon

Architect:

ARC:MC

Project Status:

Design Stage

Homan O’Brien has been appointed by Echelon to develop an initial concept design to Stage 3 Design Development stage for DUB40 site.

Specifications Include: –

  • On Site Generation 120MW
  • Planned Eirgrid Connection 110kV
  • Floors 2
  • Level 1 Plant + White Space
  • Level 2 Plant + White Space
  • Data Halls 4 (per building)
  • MW per DH 30 (per Hall)
  • Floor to ceiling height 5.5m
  • Sqm. per DH 1,665
  • Redundancy on OSG 2N
  • Redundancy on Generators N + 1
  • Redundancy on UPS N + 1
  • Cooling System Direct Air w/ Adiabatic Cooling
  • Cooling System Unit Redundancy N + 1

Homan O’Brien are currently working on Confidential Planning Submissions for two additional sites.